Princeton, NJ Data Center

Why Princeton, NJ is the Smart Alternative to NYC Colocation

Save 30–40% compared to Manhattan data centers while maintaining sub-10ms latency to Wall Street. Direct fiber connections to 7 carrier hotels across NY, NJ, and PA.

30–40%
Cost Savings vs Manhattan
Lower power and real estate costs
<10ms
Latency to NYSE/NASDAQ
Sub-millisecond to carrier hotels
7
Carrier Hotel Connections
Across NY/NJ/PA region
~50mi
Equidistant NYC & Philly
Strategic central location

The Cost Case

Manhattan colocation commands premium pricing: $180–300+/kW is standard. Princeton offers enterprise-grade infrastructure at significantly lower rates.

MetricManhattanPrinceton
Power Cost ($/kW)$180–300+Contact for pricing
Latency to Wall Street<1ms<10ms
Space AvailabilityVery LimitedAvailable Now
Expansion CapacityConstrainedUp to 10MW+
Build-to-Suit OptionsRareAvailable

JustColo Princeton pricing available on request. Contact us for a custom quote based on your power, space, and connectivity requirements.

Get Custom Pricing

The Connectivity Case

Direct fiber paths to 7 premier carrier hotels across the NY/NJ/PA region. Not third-party transport — our own managed fiber infrastructure.

165 Halsey Street, Newark
Tishman Meet Me Room
NJ
32 Avenue of the Americas, NYC
Digital Realty / CoreSite
NYC
325 Hudson Street, NYC
H5
NYC
60 Hudson Street, NYC
Digital Realty / NYI / DataBank / Epsilon
NYC
111 8th Avenue, NYC
Digital Realty / Equinix
NYC
401 North Broad Street, Philadelphia
Netrality / DataBank / CrownCastle
PA
1500 Spring Garden Street, Philadelphia
H5 / 365 DataCenters
PA

Direct Fiber Paths, Not Third-Party Transport

All connectivity options utilize JustColo-managed fiber infrastructure with diverse routing. We offer dark fiber, optical waves (100G/400G/800G), Ethernet transport (10G–100G), and IP transit (5 Gbps to 1 Tbps) to meet any connectivity requirement.

The Infrastructure Case

Purpose-built for modern workloads with unique power and cooling capabilities rarely found in the New Jersey market.

Behind-the-Meter Power

Bloom Energy natural gas fuel cells provide dedicated, behind-the-meter power — a unique offering in the NJ data center market.

  • 3MW–5MW dedicated halls available
  • Lower carbon footprint vs grid power
  • Price stability vs volatile utility rates

Redundant Power Systems

N+1 redundancy with diesel backup generators ensures continuous uptime even during extended grid outages.

  • N+1 UPS configuration
  • On-site diesel generators
  • 48+ hour fuel reserves

Advanced Cooling

Air and liquid cooling options supporting densities from 5kW to 100kW+ per rack for AI/ML and HPC workloads.

  • Precision air cooling to 40kW
  • Direct-to-chip liquid cooling
  • Rear-door heat exchangers

Frequently Asked Questions

Common questions about Princeton, NJ as a data center location.

Opening January 2027

Reserve Your Space Before January 2027

Now accepting LOIs for our Princeton facility. From single racks to multi-megawatt deployments, secure your capacity before our January 2027 ready-for-service date.